All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Manufacture butter by means of a batch churn |
SAQA US ID | UNIT STANDARD TITLE | |||
9202 | Manufacture butter by means of a batch churn | |||
ORIGINATOR | ||||
SGB Food | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 25 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2004-10-13 | 2006-04-20 | SAQA 0556/04 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2007-04-20 | 2010-04-20 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard is replaced by: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
123293 | Manufacture butter by means of a batch churn | Level 4 | NQF Level 04 | 25 |
PURPOSE OF THE UNIT STANDARD |
A person credited with this unit standard is able to:
This unit will contribute to the full development of the learner within the dairy manufacturing environment by providing recognition, further mobility and transportability within the field of manufacturing and assembly. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the dairy manufacturing and processing environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
Description of required skills:
Cleaning-in-place and cleaning out-of-place. Cream preparation procedures. Representative sample taking for quality control purposes. |
UNIT STANDARD RANGE |
The scope of this unit standard is for anyone who has to manufacture fresh butter with a batch churn.
The context of this unit standard includes butter and modified butter (butter spreads). The level assigned to this unit standard is appropriate because the process requires a wide range of technical skills and offers a considerable choice of procedures. A broad knowledge base incorporating some theoretical concepts, analytical interpretation of information, informed judgement and a range of sometime innovative responses to concrete but often unfamiliar problems are employed. The application of this unit standard is to qualify the person for certification in advanced trade and technical occupations. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Select raw materials for butter making. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The different raw materials for butter making are identified and the function of each is described according to standard dairy principles. |
ASSESSMENT CRITERION 2 |
2. The desired iodine value of cream for butter making is identified and the reason for the value is explained according to standard dairy principles |
ASSESSMENT CRITERION 3 |
3. The requirements for the cream are identified according to standard dairy principles and site specifications. |
ASSESSMENT CRITERION RANGE |
Requirements include:
|
ASSESSMENT CRITERION 4 |
4. The requirements for the salt are identified according to standard dairy principles and site specifications. |
ASSESSMENT CRITERION 5 |
5. Raw materials for butter making are selected according to standard operating procedures. |
SPECIFIC OUTCOME 2 |
Prepare cream for butter making. |
OUTCOME RANGE |
Preparation includes the following procedures:
|
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The cream is prepared for butter making according to standard operating procedures and safety requirements. |
ASSESSMENT CRITERION 2 |
2. The purpose of each of the cream preparation procedures is explained according to standard dairy principles. |
ASSESSMENT CRITERION 3 |
3. The principles of each of the cream preparation procedures are explained according to standard dairy principles. |
ASSESSMENT CRITERION 4 |
4. The parameters during each of the cream preparation procedures are identified and the reasons for the specific parameters are explained according to standard dairy principles. |
ASSESSMENT CRITERION 5 |
5. The working principles of the site-specific equipment used for cream preparation are explained and the functions of the main components are described according to standard dairy principles. |
ASSESSMENT CRITERION 6 |
6. The effects of each of the cream preparation procedures on the chemical and physical composition and the sensory qualities of cream, as well as on the quality of the final butter are described and explained according to standard dairy principles. |
ASSESSMENT CRITERION 7 |
7. The steps during each of the cream preparation procedures are identified and explained according to standard dairy principles and standard operating procedures. |
ASSESSMENT CRITERION 8 |
8. The calculations used for determining the correct amount of neutralising agent to be added are demonstrated and explained at the hand of one example and according to standard dairy principles and standard operating procedures. |
ASSESSMENT CRITERION 9 |
9. Problems during cream preparation are solved within scope of work. |
SPECIFIC OUTCOME 3 |
Prepare to manufacture fresh butter with a batch churn. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The batch churn is sanitised according to standard operating procedures. |
ASSESSMENT CRITERION 2 |
2. The sanitising materials are handled according to standard operating procedures and safety requirements. |
ASSESSMENT CRITERION 3 |
3. The batch churn's parameters are set according to standard operating procedures. |
ASSESSMENT CRITERION 4 |
4. The reasons for specific values of the different parameters are explained according to standard dairy principles, the manufacturer's specifications and minimum legislative specifications. |
ASSESSMENT CRITERION 5 |
5. The batch churn is started up according to standard operating procedures. |
ASSESSMENT CRITERION 6 |
6. Common problems are solved within scope of work. |
ASSESSMENT CRITERION RANGE |
Problem solving includes:
|
SPECIFIC OUTCOME 4 |
Manufacture fresh butter with a batch churn. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The physical changes during the transformation of cream to butter are described according to standard dairy principles. |
ASSESSMENT CRITERION 2 |
2. The operating principles of the site-specific batch churn are explained and the functions of the main components are described according to the equipment manufacturer. |
ASSESSMENT CRITERION 3 |
3. Fresh butter is manufactured according to standard operating procedures and safety requirements. |
ASSESSMENT CRITERION 4 |
4. Equipment is handled according to standard operating procedures and safety requirements. |
ASSESSMENT CRITERION 5 |
5. The composition and uses of buttermilk as by-product of butter making are identified according to standard dairy principles. |
ASSESSMENT CRITERION 6 |
6. Quality assurance parameters for butter making are monitored and controlled according to standard operating procedures. |
ASSESSMENT CRITERION 7 |
7. Samples are taken at required intervals according to standard operating procedures. |
ASSESSMENT CRITERION 8 |
8. Site-specifications for the specific butter product are identified. |
ASSESSMENT CRITERION 9 |
9. Results of sample analysis are interpreted and a conclusion is drawn on the yield and quality of the butter in terms of legal and site-specifications. |
ASSESSMENT CRITERION 10 |
10. Fresh butter is produced to conform to legal requirements and site specifications. |
ASSESSMENT CRITERION 11 |
11. Records of the process are kept according to standard operating procedures. |
ASSESSMENT CRITERION 12 |
12. Where a batch churn is operated simultaneously with other production actions or processes, the butter manufacturing process is synchronised according to standard operating procedures. |
ASSESSMENT CRITERION 13 |
13. Common butter making problems are solved within scope of work. |
ASSESSMENT CRITERION RANGE |
Problem solving includes:
|
SPECIFIC OUTCOME 5 |
Perform end of butter manufacturing procedures. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The batch churn is shut down according to standard operating procedures. |
ASSESSMENT CRITERION 2 |
2. The cleaning and sanitising requirements of a batch churn are explained in line with standard dairy and manufacturer's cleaning and sanitising principles. |
ASSESSMENT CRITERION RANGE |
The explanation covers:
|
ASSESSMENT CRITERION 3 |
3. The consequences of incorrect or inadequate cleaning and sanitising procedures on butter quality are explained according to standard dairy principles. |
ASSESSMENT CRITERION 4 |
4. The batch churn is cleaned and sanitised according to standard operating and safety procedures. |
ASSESSMENT CRITERION 5 |
5. Cleaning and sanitising materials are handled according to standard operating procedures. |
ASSESSMENT CRITERION 6 |
6. Quality assurance parameters for cleaning and sanitising are monitored and controlled according to standard operating procedures. |
ASSESSMENT CRITERION RANGE |
Parameters to be monitored and controlled include:
|
ASSESSMENT CRITERION 7 |
7. Cleaning equipment and materials are stored in designated areas according to work-site requirements. |
ASSESSMENT CRITERION 8 |
8. Waste from the cleaning process is handled and disposed of according to standard operating procedures and safety requirements. |
ASSESSMENT CRITERION 9 |
9. Records are kept according to standard operating procedures. |
ASSESSMENT CRITERION 10 |
10. All the symptoms and possible causes of all faults, or potential faults, that occur during the equipment shut down, cleaning and sanitising are identified and corrective actions are taken within scope of work. |
ASSESSMENT CRITERION 11 |
11. The equipment is left clean and ready for re-use in the designated area. |
ASSESSMENT CRITERION 12 |
12. The work area is left in a safe and clean condition. |
ASSESSMENT CRITERION 13 |
13. The butter is stored according to standard operating procedures. |
ASSESSMENT CRITERION 14 |
14. The importance of and conditions during cold storage of fresh butter are explained according to standard dairy principles. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Embedded knowledge is reflected within the assessment criteria of each specific outcome. |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems in which response displays that responsible decisions, using critical and creative thinking, have been made by:
Evident in the following specific outcomes: |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one`s activities responsibly and effectively by:
Evident in the following specific outcomes: |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information by:
Evident in the following specific outcome: |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively by using mathematical and/or language skills in the modes of oral and/or written presentations by:
Evident in the following specific outcomes: |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, showing responsibility towards the environment and health of others by:
Evident in the following specific outcomes: |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem solving contexts do not exist in isolation by:
Evident in the following specific outcomes: |
UNIT STANDARD CCFO CONTRIBUTING |
Contribute to the full personal development of each learner and the social and economic development of the society at large.
Evident in all specific outcomes. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 123293, which is "Manufacture butter by means of a batch churn", Level 4, 25 credits.
Supplementary Information: 1. Legal requirements:The following acts and/or codes, current and future regulations and amendments will be applicable: 2. Definition of terms within this unit standard: Terminology and clarification/ explanation/ definition. Butter: Refers to a butter product of which the fat contains only animal fat (butterfat). Modified butter (butter spread): Refers to a butter product of which the fat contains a combination of animal fat (butterfat) and plant fat.: Standard operating procedures: Refer to company procedures, prescribed procedures from the manufacturer, personal and food safety procedures, good manufacturing practices, best practices, applicable legislation, time frames, recipes and specifications. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 20516 | National Certificate: Food and Beverage Manufacturing Technology: Butter and Butter Related Spreads Technologist | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2006-04-20 | Was FOODBEV until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |