All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Demonstrate an understanding of lamprooms and lamproom equipment |
SAQA US ID | UNIT STANDARD TITLE | |||
376462 | Demonstrate an understanding of lamprooms and lamproom equipment | |||
ORIGINATOR | ||||
Task Team - Fabrication and Extraction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 3 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to learners who are first entrants in the mining environment, as well as people that are currently working in this field who need formal recognised training.
People credited with this unit standard will be able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
|
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Explain the role of the lamproom designated area in the mine environment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Explain the importance of the lamproom service to the mining industry as per legal requirements. |
ASSESSMENT CRITERION RANGE |
The explanation must include:
|
ASSESSMENT CRITERION 2 |
Explain the use of equipment control in a lamproom as per legal and site specific requirements. |
ASSESSMENT CRITERION RANGE |
The explanation must include:
|
ASSESSMENT CRITERION 3 |
Define the basic functions of the lamproom as per legal and site specific requirements. |
ASSESSMENT CRITERION RANGE |
The explanation must include:
|
ASSESSMENT CRITERION 4 |
Environmental impacts are discussed as per legal requirements. |
ASSESSMENT CRITERION RANGE |
Must include:
|
SPECIFIC OUTCOME 2 |
Demonstrate knowledge and understanding of lamproom types. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Explain the Self-Help type lamproom as per legal and site specific requirements. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 2 |
Explain the Manual-Issuing type lamproom as per legal and site specific requirements. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 3 |
Explain the Automated type lamproom as per legal and site specific requirements. |
ASSESSMENT CRITERION RANGE |
Must include:
|
SPECIFIC OUTCOME 3 |
Identify and describe the equipment used in the lamproom. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Identify the equipment used in a lamproom as per legal and site specific requirements. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 2 |
Explain and describe the equipment used in a lamproom according to its functions. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 3 |
The procedures to operate the equipment are explained according to manufacturer specifications. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 4 |
Describe the gas testing installation in the lamproom according to manufacturer specifications. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 5 |
The application (where/when/why) of the mine lamproom equipment is explained as per legal and operational requirements. |
ASSESSMENT CRITERION RANGE |
Must include:
|
SPECIFIC OUTCOME 4 |
Demonstrate knowledge and understanding of Occupational Health and Safety in lamprooms. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal Protective Equipment is selected, examined and us3edin a way that is consistent with its purpose, design and specified requirements. |
ASSESSMENT CRITERION 2 |
The associated Hazards and Risks related to the equipment used in a lamproom are explained. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 3 |
The associated Hazards and Risks related to the lamproom environment are explained. |
ASSESSMENT CRITERION RANGE |
Must include:
|
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The following embedded knowledge will be assessed in an integrated way in the context of the unit standard:
Critical factors relating to the Lamproom: Processes and events pertaining to the lamproom process and procedures: Causes and effects (Safety requirements): Regulations, legislation, policies and standards relating to lamproom operation: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Work effectively with others as a member of a team, group, organisation or community:
Note: |
UNIT STANDARD CCFO ORGANISING |
Organise and manage himself/herself and his/her activities responsibly effectively:
Note: |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information:
Note: |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically showing responsibility towards the environment and health of others:
Note: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Terminology:
Specified requirements include legal and site-specific requirements and are contained in one or more of the following documents: Legal: Site-Specific: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 78323 | National Certificate: Lamproom Operations | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MQA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |