All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Fault find and repair process control loops |
SAQA US ID | UNIT STANDARD TITLE | |||
262483 | Fault find and repair process control loops | |||
ORIGINATOR | ||||
SGB Generic Manufacturing, Engineering, Technology | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Engineering and Related Design | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 15 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Manufacturing Engineering and Technology field.
A person credited with this unit standard will be able to: This unit standard will contribute to the full development of the learner within the Measurement Control and Instrumentation environment by providing recognition, further mobility and transportability within the field of Manufacturing Engineering and Technology. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and development within the Measurement Control and Instrumentation environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and/or equivalent:
|
UNIT STANDARD RANGE |
The range of this unit standard includes faultfinding, diagnosis and the repair of integrated process control loops, relating to temperature, flow, pressure, level and final control elements with associated equipment.
Safety precautions include the use of all personal protective equipment, electrical and fire protection. Requirements include but are not limited to statutory requirements, National Standards and manufacturers specifications. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Establish conditions for fault finding and repairing Process Control Loops. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work area is prepared in accordance with workplace procedures. |
ASSESSMENT CRITERION 2 |
Tools and equipment are selected as appropriate for the required task. |
ASSESSMENT CRITERION 3 |
Relevant sources of information are identified and selected according to workplace procedures. |
ASSESSMENT CRITERION 4 |
Relevant safety equipment is obtained in accordance with workplace procedures. |
ASSESSMENT CRITERION 5 |
Relevant documentation is obtained in accordance with workplace procedures. |
SPECIFIC OUTCOME 2 |
Diagnose faults in Process Control Loops. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Appropriate test equipment is selected for the given faults. |
ASSESSMENT CRITERION 2 |
Test equipment is connected and set up according to manufacturer's instructions. |
ASSESSMENT CRITERION 3 |
The test is performed in accordance with manufacturer specifications and all faults are identified. |
ASSESSMENT CRITERION 4 |
Test values are recorded and compared against values on application data sheets. |
ASSESSMENT CRITERION 5 |
Process Control Loops are decommissioned in accordance with workplace procedures. |
SPECIFIC OUTCOME 3 |
Repair Process Control Loops. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Functional tests are performed according to manufacturer's instructions. |
ASSESSMENT CRITERION 2 |
Faulty components are identified and repaired or replaced in accordance with manufacturer specifications. |
ASSESSMENT CRITERION 3 |
Equipment is re-assembled and calibrated according to manufacturer's instructions. |
ASSESSMENT CRITERION 4 |
Equipment is confirmed to be in accordance with operating parameters. |
SPECIFIC OUTCOME 4 |
Establish normal operating conditions after completion of repairs. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Process Control Loops are commissioned in accordance with workplace procedures. |
ASSESSMENT CRITERION 2 |
The work area is restored and tidied, and equipment is stored according to workplace procedures. |
ASSESSMENT CRITERION 3 |
Relevant documentation is completed in accordance with organisation requirements. |
ASSESSMENT CRITERION 4 |
Test equipment is disconnected and stored according to workplace procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
A basic understanding of:
A comprehensive understanding of: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identification and problem solving skills - faulty equipment identified and reported. |
UNIT STANDARD CCFO WORKING |
Work effectively with others - working under supervision. |
UNIT STANDARD CCFO COMMUNICATING |
Communication skills - reporting faulty Process Control Loops and interpreting job requirements. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Equipment associated equipment could include those mentioned in the range statements of the NQF Level 2 unit standards for Flow, Level, Temperature, Pressure and Final control elements. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 74531 | Further Education and Training Certificate: Measurement, Control and Instrumentation | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |