All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Make up fluid power tube assemblies |
SAQA US ID | UNIT STANDARD TITLE | |||
244712 | Make up fluid power tube assemblies | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 5 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The skills, values and knowledge reflected in this unit standard are required by people in the field of Fluid Power Engineering who are required to identify tube and fittings and manipulate tubing to a pre determined position with minimum wastage while adhering to safe working practice and cleanliness levels. The learning outcomes in this unit standard also contribute to the exit level outcomes required for the fluid power NQF Level 3 qualification.
Persons credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit calculation is based on the assumption that a person is already competent in terms of the following outcomes when starting to learn toward this unit standard:
|
UNIT STANDARD RANGE |
> DIN 2391/C. > DIN 2445, EN10305. Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate an understanding of tubes and fittings. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Hydraulic tubes are identified according to manufacturer's classification in terms of pressure ratings and the safety factors. |
ASSESSMENT CRITERION RANGE |
Pipe sizes are up to and including 42 mm, S and L series. This will not include an understanding of the manufacturing process. |
ASSESSMENT CRITERION 2 |
Hydraulic tube fittings are identified according to manufacturer's classification in terms of pressure ratings and the safety factors. |
ASSESSMENT CRITERION RANGE |
Fitting sizes are up to and including 42 mm, S and L series. |
ASSESSMENT CRITERION 3 |
Pneumatic tubes are identified in accordance with manufacturer's ratings. |
ASSESSMENT CRITERION RANGE |
The various tubing materials are identified and their characteristics are listed with reference to the bend radius, flexibility, pressure ratings and medium in use. |
ASSESSMENT CRITERION 4 |
Pneumatic fittings are identified in accordance with manufacturer's ratings. |
ASSESSMENT CRITERION RANGE |
The various fittings are identified with reference to the connection type, pressure ratings and medium in use. |
SPECIFIC OUTCOME 2 |
Demonstrate an understanding of the different methods of attaching tubes and fittings. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Male and female threads are identified in accordance with national and international standards. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 2 |
Different types of connections for the pipes and tubes are explained in accordance with manufactures specifications. |
ASSESSMENT CRITERION RANGE |
Competence must be demonstrated against at least 3 of the following: nut and olive, nut and flare, pipe forming, nut and insert, push in or flat-faced. |
ASSESSMENT CRITERION 3 |
The process of attaching tubes and fittings is explained in accordance with manufacturer specifications. |
SPECIFIC OUTCOME 3 |
Make up fluid power tube assembly. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Tubing is cut and de-burred in accordance with the fitting manufacturer's specifications. |
ASSESSMENT CRITERION 2 |
Tubing is manipulated in accordance with workplace requirements. |
ASSESSMENT CRITERION RANGE |
Workplace requirements include size of tube, bend radius and use of tools. |
ASSESSMENT CRITERION 3 |
Work is conducted in accordance with agreed time frames. |
ASSESSMENT CRITERION 4 |
Work is conducted efficiently with minimum wastage in accordance with workplace accepted standards. |
ASSESSMENT CRITERION 5 |
Fittings are connected to the tubing in accordance with the fitting manufacturer's specification. |
ASSESSMENT CRITERION 6 |
End connections are terminated in accordance with installation requirements. |
ASSESSMENT CRITERION 7 |
Tube assembly is leak-free. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Essential embedded knowledge will be assessed through assessment of the specific outcomes in terms of the stipulated assessment criteria. Candidates are unlikely to achieve all the specific outcomes, to the standards described in the assessment criteria, without knowledge of the listed embedded knowledge. This means that for the most part, the possession or lack of the knowledge can be directly inferred from the quality of the candidate's performance. Where direct assessment of knowledge is required, assessment criteria have been included in the body of the unit standard.
The following embedded knowledge is addressed in an integrated way in the unit standard: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as members of a team, group, organisation or community. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage themselves and their activities responsibly and effectively.
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively, using visual, mathematical and/or language skills in the modes of oral and/or written presentations. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically showing responsibility towards the environment and health of others.
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Terminology:
Notes to Assessors: Assessors should keep the following principles in mind when designing and conducting assessments against this unit standard: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 58882 | National Certificate: Fluid Power | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |