All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Perform remote operations from an electronic management system on hydro and gas driven power generating plant |
SAQA US ID | UNIT STANDARD TITLE | |||
242760 | Perform remote operations from an electronic management system on hydro and gas driven power generating plant | |||
ORIGINATOR | ||||
SGB Power Plant Operations | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Engineering and Related Design | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 9 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The person credited with this unit standard is able to perform remote operating activities regarding the starting and shut down as well as mode changes for electrical load dispatch control purposes. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
|
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Perform remote operations on hydro driven power generating plant. |
OUTCOME RANGE |
Hydro and Pump Storage schemes. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Operating conditions for start-up of generating plant are confirmed according to contractual requirements and operating procedures. |
ASSESSMENT CRITERION 2 |
Mode changes are selected according to operating procedures and system requirements. |
ASSESSMENT CRITERION 3 |
Generating plant start-up is performed according to operating procedure. |
ASSESSMENT CRITERION 4 |
Plant running conditions are monitored according to operating requirements. |
ASSESSMENT CRITERION 5 |
Abnormal system conditions are identified and appropriate action taken according to operating procedures. |
ASSESSMENT CRITERION 6 |
Generating plant shutdown activities are confirmed and performed according to operating procedures and system requirements. |
ASSESSMENT CRITERION 7 |
Plant operating conditions and activities are reported and recorded according to organisational requirements. |
SPECIFIC OUTCOME 2 |
Perform remote operations on Gas Turbine power generating plant. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Operating conditions for start-up of generating plant are confirmed according to contractual requirements and operating procedures. |
ASSESSMENT CRITERION 2 |
Mode changes are selected according to operating procedures and system requirements. |
ASSESSMENT CRITERION 3 |
Generating plant start-up is performed according to operating procedure. |
ASSESSMENT CRITERION 4 |
Plant running conditions are monitored according to operating requirements. |
ASSESSMENT CRITERION 5 |
Abnormal system conditions are identified and appropriate action taken according to operating procedures. |
ASSESSMENT CRITERION 6 |
Generating plant shutdown activities are confirmed and performed according to operating procedures and system requirements. |
ASSESSMENT CRITERION 7 |
Plant operating conditions and activities are reported and recorded according to organisational requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identifying & solving problems in which responses display that responsible decisions using critical and creative thinking have been made. |
UNIT STANDARD CCFO WORKING |
Working effectively with others as a member of a team, group, organization, community. |
UNIT STANDARD CCFO ORGANISING |
Organising and managing oneself and one's activities responsibly and effectively. |
UNIT STANDARD CCFO COLLECTING |
Collecting, analysing, organizing and critically evaluating information. |
UNIT STANDARD CCFO COMMUNICATING |
Communicating effectively using visual, mathematical and/or language skills in the modes of oral and/or written persuasion. |
UNIT STANDARD CCFO SCIENCE |
Using science and technology effectively and critically, showing responsibility towards the environment and health of others. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrating an understanding of the world as a set of related systems by recognizing that problem-solving contexts do not exist in isolation. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Note to assessors:
The following conditions where applicable must be considered throughout assessment of Specific Outcome: "Perform remote operations on hydro driven power generating plant." The following conditions where applicable must be considered throughout assessment of Specific Outcome: "Perform remote operations on hydro driven power generating plant." |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 57693 | National Diploma: Electrical Network Power Dispatch Controlling | Level 5 | NQF Level 05 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | EWSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |