All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Remove an accumulation of water from an orepass |
SAQA US ID | UNIT STANDARD TITLE | |||
15271 | Remove an accumulation of water from an orepass | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 1 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2007-04-03 | 2007-08-16 | SAQA 0160/05 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2008-08-16 | 2011-08-16 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are required to remove an accumulation of water from an orepass.
People credited with this unit standard are able to |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit calculation is based on the assumption that learners are already competent in terms of the following outcomes or areas of learning when starting to learn towards this unit standard:
Persons attempting this unit should have knowledge of: |
UNIT STANDARD RANGE |
Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Explain the specified requirements regarding the removal of accumulation of water from an orepass. |
OUTCOME NOTES |
Explain the specified requirements regarding the removal of an accumulation of water from an orepass. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The risks associated with the workplace hazards pertaining to the removal of an accumulation of water from an orepass are explained. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 2 |
2. The risks associated with the work related hazards pertaining to the removal of an accumulation of water from an orepass are explained. |
ASSESSMENT CRITERION RANGE |
SPECIFIC OUTCOME 2 |
Prepare to remove an accumulation of water from an orepass. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The required personal protective equipment is available, fit for purpose and used according to specified requirements. |
ASSESSMENT CRITERION 2 |
2. The required tools, material and equipment are available in the workplace and fit for purpose according to specified requirements. |
ASSESSMENT CRITERION 3 |
3. Tools, material and equipment are transported, positioned and prepared according to specified requirements. |
ASSESSMENT CRITERION 4 |
4. The area where the accumulation of water is to be removed is examined for workplace hazards and such hazards are dealt with according to specified requirements. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 5 |
5. Precautions taken to prevent injuries and property damage are according to specified requirements in terms of the placement of warning signs, securing and warning given. |
ASSESSMENT CRITERION 6 |
6. The consequences to safety, health and productivity, if specified requirements are not adhered to whilst preparing to remove an accumulation of water from an orepass, are explained. |
ASSESSMENT CRITERION RANGE |
SPECIFIC OUTCOME 3 |
Remove an accumulation of water from an orepass. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The accumulation of water is removed from the orepass according to specified requirements in terms of method used and safety measures taken to prevent injuries and property damage. |
ASSESSMENT CRITERION 2 |
2. The tools and equipment are used according to specified requirements and in line with accepted ergonomic principles. |
ASSESSMENT CRITERION 3 |
3. Critical work-related hazards are dealt with according to specified requirements. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 4 |
4. Tools and equipment are prepared and stored for subsequent use and those defective are dealt with according to specified requirements. |
ASSESSMENT CRITERION 5 |
5. Interpersonal interaction is positive, consistent with specified requirements, promotes effective teamwork and avoids dysfunctional conflict. |
ASSESSMENT CRITERION 6 |
6. Reports are completed and submitted according to specified requirements. |
ASSESSMENT CRITERION 7 |
7. Consequences to health, safety and productivity if specified requirements are not adhered to whilst removing an accumulation of water from an orepass are explained. |
ASSESSMENT CRITERION RANGE |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.
2. Any institution offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA by SAQA. 3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines and the agreed ETQA procedures. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Essential embedded knowledge will be assessed through assessment of the specific outcomes in terms of the stipulated assessment criteria. Candidates are unlikely to achieve all the specific outcomes, to the standards described in the assessment criteria, without knowledge of the listed embedded knowledge. This means that for the most part, the possession or lack of the knowledge can be directly inferred from the quality of the candidate`s performance. Where direct assessment of knowledge is required, assessment criteria have been included in the body of the unit standard.
The following embedded knowledge is addressed in an integrated way in the unit standard: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as members of a team, group, organisation or community.
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage themselves and their activities responsibly and effectively.
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively, using visual, mathematical and/or language skills in the modes of oral and/or written presentations.
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically showing responsibility towards the environment and health of others.
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
|
UNIT STANDARD ASSESSOR CRITERIA |
Assessors should keep the following principles in mind when designing and conducting assessments against this unit standard:
|
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 244364, which is "Remove an accumulation of water from an ore pass", Level 2, 1 credit.
TERMINOLOGY SPECIFIED REQUIREMENTS Specified requirements include legal and site-specific requirements and are contained in one or more of the following documents: LEGAL SITE SPECIFIC |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49013 | National Certificate: Mining Operations: Underground Hard Rock | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2007-08-16 | Was MQA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | CONCOR PROJECTS PTY LTD |
2. | FINSCH DIAMOND MINE(PTY) LTD |
3. | FOSKOR (PTY) LTD |
4. | HARMONY GOLD MINING CO LTD |
5. | IMPALA PLATINUM SERVICES LTD |
6. | MATHOME TRAINING AND DEVELOPMENT (PTY) LTD |
7. | MODIKWA MINING PERSONNEL SERVICES PTY L TD |
8. | NORTHAM PLATINUM LTD |
9. | PALABORA COPPER (PTY) LTD |
10. | SENZEKO EXECUTIVE RISK CC |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |