All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Prepare industrial rubber manufacturing equipment |
SAQA US ID | UNIT STANDARD TITLE | |||
13160 | Prepare industrial rubber manufacturing equipment | |||
ORIGINATOR | ||||
SGB Plastics Manufacturing | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 12 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
Learners in the field of industrial rubber manufacturing require the skills, values and knowledge reflected in this unit standard in order to understand how industrial rubber manufacturing equipment is prepared.
Qualifying learners can prepare required rubber production equipment for manufacturing to ensure smooth production. They will understand the importance of equipment preparation and how this is achieved. This will include a basic knowledge of the functioning of the equipment, what it is used for and how to identify pre-production problems. The learning outcomes in this unit standard also contribute to the exit level outcomes required for the National Certificate in Industrial Rubber Manufacturing (Mixing, Extruding, Moulding or Calendaring) (NQF level 2) and related qualifications. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
This unit standard has been designed as part of a progression. It is one of a series of unit standards for producing product in an industrial rubber manufacturing setting.
The credits allocated to this unit standard assume that a learner has already learned to: |
UNIT STANDARD RANGE |
The ranges as indicated under the specific outcomes determine the scope and level of this unit standard.
All work is performed under supervision and according to worksite and manufacturer specifications and occupational safety, health and environmental legislation. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan production equipment preparation. |
OUTCOME RANGE |
Planning includes collecting job cards, schedules, determining simple set up requirements
and sequencing activities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 2 |
Prepare site for equipment set up. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 3 |
Prepare equipment for use. |
OUTCOME NOTES |
OUTCOME RANGE |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 4 |
Produce first-off product while monitoring equipment indicators. |
OUTCOME RANGE |
Equipment indicators include visual indicators (pressure and temperature) |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 5 |
Identify problems and take corrective action. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 6 |
Apply quality checks on completed work / pre-production samples. |
OUTCOME RANGE |
Quality checks include visual and dimensional checks |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 7 |
Care for and store equipment preparation tools and equipment. |
OUTCOME RANGE |
Caring for includes cleaning and lubrication |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 8 |
Record information on work done and report machine readiness. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 9 |
Discuss and explain incidents and problems related to equipment preparation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
SPECIFIC OUTCOME 10 |
Work safely with due care for self, fellow workers, equipment, materials and the environment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Equipment preparation activities meet equipment and process specifications. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. First-off product is produced. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Records are completed and processed and reports made. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications 2. Work area is prepared 3. Availability of auxiliary services is confirmed 4. Equipment functionality is confirmed 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications 6. Equipment preparation process cycle time meets with company requirements 7. First production run meets specifications 8. Problems are identified in a timely manner and reported to appropriate personnel 9. A clean and tidy work environment is maintained 10. No delays are caused as a result of poor planning and failure to identify problems 11. Report and records are accurate and clear 12. Applicable health, safety and environmental procedures are adhered to 13. Protective equipment is selected and worn / used Understanding confirmed: Respond to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
Results achieved
1. Equipment preparation activities meet equipment and process specifications. 2. First-off product is produced. 3. Records are completed and processed and reports made. Indicators 1. Equipment preparation tools and equipment are prepared, cared for and stored in accordance with manufacturer specifications. 2. Work area is prepared. 3. Availability of auxiliary services is confirmed. 4. Equipment functionality is confirmed. 5. Equipment preparation is carried out in a safe manner in accordance with schedules and manufacturer specifications. 6. Equipment preparation process cycle time meets with company requirements. 7. First production run meets specifications. 8. Problems are identified in a timely manner and reported to appropriate personnel. 9. A clean and tidy work environment is maintained. 10. No delays are caused as a result of poor planning and failure to identify problems. 11. Report and records are accurate and clear. 12. Applicable health, safety and environmental procedures are adhered to. 13. Protective equipment is selected and worn / used. Understanding confirmed 1. Respond to `what if` and `why` questions related to: |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
My assessment will be governed by the policies and guidelines of the MERSETA Education and Training Quality Assuror who has jurisdiction over this field of learning. My assessor will (at the very least) be accredited and have a technical qualification in this learning area.
I can be assessed in the language of my choice although if I have to report incidents or conditions to someone else, I will be assessed on my ability to report in the language commonly used in my working environment. I will be assessed in the workplace but I can submit documents, projects, test results and assignments that were not produced in the workplace. I can be assessed against this unit standard to obtain credits or as part of an integrated assessment for a qualification. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
1. Names & functions of:
2. Purpose of: 3. Attributes, descriptions, characteristics & properties: 4. Sensory cues: 5. Processes and events, causes and effects, implications of: 6. Procedures and techniques: 7. Regulations, legislation, agreements, policies, standards: 8. Theory: rules, principles, laws: 9. Relationships, systems: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems:
|
UNIT STANDARD CCFO WORKING |
Work effectively with others:
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage myself and my activities:
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information:
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively:
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 23257 | National Certificate: Industrial Rubber Manufacturing: Mixing OR Extruding OR Moulding OR Calendaring | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2011-02-16 | MERSETA |
Elective | 79408 | National Certificate: Polymer Compound Manufacturing | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |