All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Wire and commission three phase electrical circuits |
SAQA US ID | UNIT STANDARD TITLE | |||
114389 | Wire and commission three phase electrical circuits | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 8 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
10266 | Wire and commission three phase electrical circuits | Level 4 | NQF Level 04 | 8 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Electrical Engineering; Generation; Distribution; Transmission, Construction and Renewable Energy Sector.
A person credited with this unit standard will understand and be able to: This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and / or equivalent:
|
UNIT STANDARD RANGE |
This unit standard applies to persons wiring and commissioning three phase electrical circuits independently.
Statutory requirements include but is not limited to a. OHS Act b. SABS 0142 c. Local Authority requirements d. Manufactures specifications e. Worksite procedures Electrical drawings include but is not limited to: a. Schematic diagrams b. Wiring diagrams c. Connection / terminal schedules d. Cable schedules e. Layout drawings f. Floor / building plans Electrical components / material include but is not limited to: a. AC and DC relays b. Timers c. Push buttons d. Indication lights e. Overload devices f. Limit / proximity switches Switches a. Protective devices (fuses, circuit breakers, earth leakage units, etc.) b. Connection terminals c. Fixed electrical measuring instruments and auxiliary equipment (voltmeter and Voltage Transformer, ammeter and Current Transformer, etc.) Commissioning test include but is not limited to: a. Continuity test b. Alarm continuity tests c. Insulation resistance test d. Polarity test e. Voltage test f. Loop impedance test Safety and good housekeeping practices are adhered to before and after performance Three phase electrical circuits include but are not limited to: a. Sequence circuits b. Motor control circuits (star/delta forward and reverse) c. Load balancing d. Metering e. Current Transformer and Voltage Transformer |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan work task. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Job instruction is evaluated and a sequence of operation is determined. |
ASSESSMENT CRITERION 2 |
2. Electrical drawings are correctly interpreted or sketched according to applicable statutory requirements |
ASSESSMENT CRITERION 3 |
3. Components and materials are correctly identified and selected as per applicable electrical drawings |
ASSESSMENT CRITERION 4 |
4. Platforms and equipment needed to wire and commission are analised for functionality, safety and available for use |
ASSESSMENT CRITERION 5 |
5. Permission is obtained to carry out task according to instructions and drawings |
ASSESSMENT CRITERION 6 |
6. Work area is prepared according to worksite procedures |
SPECIFIC OUTCOME 2 |
Wire three phase electrical circuits. |
OUTCOME RANGE |
SABS 0142. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site specific safety procedures are adhered to throughout wiring of electrical circuits. |
ASSESSMENT CRITERION 2 |
2. Evaluate if wireways and distribution board are installed according to drawings on plan. |
ASSESSMENT CRITERION 3 |
3. Cables and conductors are pulled or installed into electrical wire ways according to applicable electrical drawings and statutory requirements. |
ASSESSMENT CRITERION 4 |
4. Cables and conductors are terminated, numbered and connected according to
electrical drawings and statutory requirements. |
ASSESSMENT CRITERION 5 |
5. All components are fitted, assembled and labelled according to electrical drawings
and statutory requirements. |
SPECIFIC OUTCOME 3 |
Commission three phase electrical circuits. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Applicable test instruments are selected and evaluated for functionality and safety prior to conducing tests. |
ASSESSMENT CRITERION 2 |
2. Commissioning tests are carried out safely and according to statutory requirements. |
ASSESSMENT CRITERION RANGE |
Continuity test, alarm continuity test, installation resistance, polarity, voltage and loop impedance test, earth electrode test and phase rotation, earth leakage tests. |
ASSESSMENT CRITERION 3 |
3. Commissioning report and test results are accurately recorded and reliably communicated according to worksite procedures. |
ASSESSMENT CRITERION 4 |
4. Commissioning of circuits is done according to worksite procedures. |
SPECIFIC OUTCOME 4 |
Complete work task. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Work area is cleaned after completion of task according to housekeeping standards. |
ASSESSMENT CRITERION 2 |
2. Waste material is disposed of according to specific standards and procedures. |
ASSESSMENT CRITERION 3 |
3. Applicable electrical drawings are correctly updated and stored according to statutory requirements |
ASSESSMENT CRITERION 4 |
4. Job cards are accurately completed in accordance with worksite procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. Anyone assessing a learner against this unit standard must be registered as anm assessor with the relevant ETQA.
2. Any provider offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA. 3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines in the relevant qualification and the agreed ETQA procedures. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Knowledge that will help me understand and that I will be able to explain:
|
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems related to the achievement of relevant competencies. |
UNIT STANDARD CCFO ORGANISING |
Organise oneself and one`s activities so that all requirements are met in achieving competence in the wiring of premises. |
UNIT STANDARD CCFO COLLECTING |
Collect, evaluate, organise and critically evaluate information related to wiring of industrial premises so that these are accurately interpreted into application performance standards. |
UNIT STANDARD CCFO DEMONSTRATING |
Understand the world as a set of related systems in that are interrelated with the overall safe and lawful. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This Unit Standard replaces Unit Standard 10266 - 'Wire and commission three phase electrical circuits'.
SAQA decision number 2452/04 on 11 February 2004. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 48727 | National Certificate: Sugar Manufacturing and Refining Technical Maintenance | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | AgriSETA |
Core | 48474 | National Certificate: Electrical Engineering | Level 4 | Level TBA: Pre-2009 was L4 | Passed the End Date - Status was "Reregistered" |
2009-02-18 | Was EWSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |