All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Demonstrate understanding of regulations codes and drawing office practices for structural steel detailing |
SAQA US ID | UNIT STANDARD TITLE | |||
114194 | Demonstrate understanding of regulations codes and drawing office practices for structural steel detailing | |||
ORIGINATOR | ||||
SGB Civil Engineering Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Civil Engineering Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 7 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2026-06-30 | 2029-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
A person credited with this unit standard will be able to:
Explain structural steel detail drawing regulations, codes and practices, describe the structure and layout of drawing offices, office administration and communication procedures and plan and schedule work requirements. The contribution to The National Skills Development Strategy is the key developmental interface between learners and new competencies to be achieved. Learners who master the competence described in this unit standard will be able to apply their understanding of drawing office practice and procedures to implement effective self organisation methods in the drawing office environment which meet Occupational Health and Safety legislation and ergonomic requirements. In addition, the learners application of structural steel regulations, codes, practices and drawing office procedures to programme planning and communication processes between drawing office and client will ensure that the time and cost implication associated with the repeated revision of drawings is minimised. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and / or equivalent:
|
UNIT STANDARD RANGE |
Learner Draughtsman, Junior Draughtsman, Draughtsman, Senior Draughtsman, Section Leader, Chief Draughtsman/Drawing Office Manager. photocopiers, large format plan printers, inkjet printers. Contract Number, Drawing Number, Revision Number, Description, Dates and location of Distribution, Mass of the assemblies. Receipt of information, detail drawings, bought out items, material purchasing, fabrication, delivery and erection, commissioning, Bar charts and critical path analysis programmes. Listing material for reservation, preparing detail drawings, checking of detail drawings, listing material for purchasing, obtaining approval, issuing of drawings. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Explain and illustrate regulations, codes and practices for the production of structural steel. |
OUTCOME NOTES |
Explain and illustrate regulations, codes and practices for the production of structural steel detail drawings. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Spacing and minimum edge distances for fastener holes as specified in SABS 0162: Part 1, Clauses 22.5 to 22.8 are explained and illustrated. |
ASSESSMENT CRITERION 2 |
2. Gauges and backmarks are explained and illustrated. |
ASSESSMENT CRITERION 3 |
3. Impact wrench dimensions and bolt clearances are explained. |
ASSESSMENT CRITERION 4 |
4. Dimensions of beam notches are explained and illustrated. |
ASSESSMENT CRITERION 5 |
5. Joint and weld types indicated in Clause 6.2 of the Southern African Structural Steelwork Detailing Manual are explained and illustrated. |
ASSESSMENT CRITERION 6 |
6. Edge preparations for welding indicated in Clause 6.3 of the Southern African Structural Steelwork Detailing Manual are explained and illustrated. |
ASSESSMENT CRITERION 7 |
7. Reinforcement and backing for full penetration and partial penetration groove welds indicated in Clause 6.4 of the Southern African Structural Steelwork Detailing Manual are explained. |
SPECIFIC OUTCOME 2 |
Describe the structure and layout of drawing offices. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The composition and organisation of workgroups in drawing offices is described. |
ASSESSMENT CRITERION 2 |
2. The impact of natural and artificial lighting in relation to the location of drawing boards and computer workstations in drawing offices is described. |
ASSESSMENT CRITERION 3 |
3. The accessibility of reference tables in relation to drawing boards and computer work stations is discussed. |
ASSESSMENT CRITERION 4 |
4. Manual and electronic systems and procedures used for the filing of drawings and related documents are described. |
ASSESSMENT CRITERION 5 |
5. The impact of the location and position of filing units in relation to the need for easy and efficient access to information is discussed. |
ASSESSMENT CRITERION 6 |
6. Machines and equipment used for the reproduction of drawings are identified and the importance of maintenance is discussed. |
ASSESSMENT CRITERION 7 |
7. A range of drawing reproduction processes are identified and described. |
ASSESSMENT CRITERION 8 |
8. The impact of good housekeeping practices in relation to the requirements of the Occupational Health and Safety legislation is discussed. |
SPECIFIC OUTCOME 3 |
Describe drawing office administration procedures. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The format and purpose of Drawing Registers is described. |
ASSESSMENT CRITERION 2 |
2. Processes for reviewing/checking drawings are described and their impact on drawing office administration procedures is discussed. |
ASSESSMENT CRITERION 3 |
3. Procedures for distributing copies of structural steel detail drawings are described. |
ASSESSMENT CRITERION 4 |
4. Procedures for making revisions to structural steel detail drawings are described. |
ASSESSMENT CRITERION 5 |
5. The reasons for using transmittal slips for recording the distribution of drawings is discussed. |
ASSESSMENT CRITERION 6 |
6. Drawing prints to be transmitted or filed are folded in accordance with folding methods. |
SPECIFIC OUTCOME 4 |
Describe drawing office communication procedures. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The role of different types of communication media and their impact on information transmission between drawing offices and clients in the structural steel context is discussed. |
ASSESSMENT CRITERION 2 |
2. Elements of contract documentation are identified and the pre-requisites of each element is described. |
ASSESSMENT CRITERION 3 |
3. The consequences of misinterpreting contract documentation and client specifications are discussed. |
ASSESSMENT CRITERION 4 |
4. Procedures for addressing technical queries to clients are described. |
ASSESSMENT CRITERION 5 |
5. Procedures for handling modifications to fabricated assemblies on site are described. |
ASSESSMENT CRITERION 6 |
6. The importance of recording and confirming verbal instructions to prevent possible confusion and disputes in relation to the contract works are discussed. |
SPECIFIC OUTCOME 5 |
Plan and schedule work requirements. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The importance of planning accurate programmes for preparing detail drawings of all structural steelwork assemblies in terms of available manpower and in accordance with client requirements is discussed (normally bar charts). |
ASSESSMENT CRITERION 2 |
2. The importance of developing an accurate project programme of all activities associated with a structural steelwork contract in accordance with client requirements are described (initially bar charts). |
ASSESSMENT CRITERION 3 |
3. The consequences of exceeding elements of a contract programme and the impact of penalties is discussed. |
ASSESSMENT CRITERION 4 |
4. The effect that client and drawing office changes and errors have on the programme and the impact that revisions have on cost are discussed. |
ASSESSMENT CRITERION 5 |
5. Programmes for structural steel detailing are developed and presented to clients in accordance with specified requirements. |
ASSESSMENT CRITERION 6 |
6. Reports on detailing progress are prepared and presented to clients in accordance with contract requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems. |
UNIT STANDARD CCFO WORKING |
Work effectively with others. |
UNIT STANDARD CCFO ORGANISING |
Employ self management. |
UNIT STANDARD CCFO COLLECTING |
Manage information.
1. Specific Outcome: Explain and illustrate regulations, codes and practices for the production of structural steel detail drawings. Assessment Criteria: 1.1 Spacing and minimum edge distances for fastener holes as specified in SABS 0162: Part 1, Clauses 22.5 to 22.8 are explained and illustrated. 1.2. Gauges and backmarks are explained and illustrated. 1.3. Impact wrench dimensions and bolt clearances are explained. 1.4. Dimensions of beam notches are explained and illustrated. 1.5. Joint and weld types indicated in Clause 6.2 of the Southern African Structural Steelwork Detailing Manual are explained and illustrated. 1.6. Edge preparations for welding indicated in Clause 6.3 of the Southern African Structural Steelwork Detailing Manual are explained and illustrated. 1.7. Reinforcement and backing for full penetration and partial penetration groove welds indicated in Clause 6.4 of the Southern African Structural Steelwork Detailing Manual are explained. 2. Specific Outcome: Describe the structure and layout of drawing offices. Assessment Criteria: 2.1. The composition and organisation of workgroups in drawing offices is described 2.2. Manual and electronic systems and procedures used for the filing of drawings and related documents are described 2.3. Machines and equipment used for the reproduction of drawings are identified and the importance of maintenance is discussed. 2.4. A range of drawing reproduction processes are identified and described. 3. Specific Outcome: Describe drawing office administration procedures. Assessment Criteria: 3.1 The format and purpose of Drawing Registers is described. 3.2. Processes for reviewing/checking drawings are described and their impact on drawing office administration procedures is discussed. 3.3. Procedures for distributing copies of structural steel detail drawings are described. 3.4. Procedures for making revisions to structural steel detail drawings are described. 3.5. The reasons for using transmittal slips for recording the distribution of drawings is discussed. 4. Specific Outcome: Describe drawing office communication procedures. Assessment Criteria 4.1 The role of different types of communication media and their impact on information transmission between drawing offices and clients in the structural steel context is discussed. 4.2 Elements of contract documentation are identified and the pre-requisites of each element is described. 4.3 The consequences of misinterpreting contract documentation and client specifications are discussed. 4.4 Procedures for addressing technical queries to clients are described. 4.5 Procedures for handling modifications to fabricated assemblies on site are described. 4.6 The importance of recording and confirming verbal instructions to prevent possible confusion and disputes in relation to the contract works are discussed. |
UNIT STANDARD CCFO COMMUNICATING |
4. Specific Outcome:
Describe drawing office communication procedures. Assessment Criteria 4.1 The role of different types of communication media and their impact on information transmission between drawing offices and clients in the structural steel context is discussed. 4.2 Elements of contract documentation are identified and the pre-requisites of each element is described. 4.3 The consequences of misinterpreting contract documentation and client specifications are discussed. 4.4 Procedures for addressing technical queries to clients are described. 4.5 Procedures for handling modifications to fabricated assemblies on site are described. 4.6 The importance of recording and confirming verbal instructions to prevent possible confusion and disputes in relation to the contract works are discussed. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate scientific and technological competence.
1. Specific Outcome: Describe drawing office administration procedures. Assessment Criteria: 1.1 Drawing prints to be transmitted or filed are folded in accordance with folding methods. 2. Specific Outcome: Plan and schedule work requirements. Assessment Criteria: 2.1. The importance of planning accurate programmes for preparing detail drawings of all structural steelwork assemblies in terms of available manpower and in accordance with client requirements is discussed (normally bar charts). 2.2. The importance of developing an accurate project programme of all activities associated with a structural steelwork contract in accordance with client requirements are described (initially bar charts). 2.3. The consequences of exceeding elements of a critical path and the impact of penalties is discussed 2.4. The effect that client and drawing office changes and errors have on the programme and the impact that revisions have on cost are discussed. 2.5. Programmes for structural steel detailing are developed and presented to clients in accordance with specified requirements. 2.6. Reports on detailing progress are prepared and presented to clients in accordance with contract requirements. |
UNIT STANDARD CCFO CONTRIBUTING |
Understand Contextual world-systems.
1. Specific Outcome: Describe the structure and layout of drawing offices. Assessment Criteria: 1.1. The impact of natural and artificial lighting in relation to the location of drawing boards and computer workstations in drawing offices is described. 1.2. The accessibility of reference tables in relation to drawing boards and computer work stations is discussed 1.3. The impact of the location and position of filing units in relation to the need for easy and efficient access to information is discussed. 1.4. The impact of good housekeeping practices in relation to the requirements of the Occupational Health and Safety legislation is discussed. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Total hours required by the learner to achieve the required outcomes:
Activity Hours Classroom learning 30 On-the-job learning 30 Self directed learning Coaching required 10 Other TOTAL 70 |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 48636 | National Diploma: Structural Steelwork Detailing | Level 5 | NQF Level 05 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | CETA |
Elective | 50018 | Further Education and Training Certificate: Computer Aided Drawing Office Practice | Level 4 | NQF Level 04 | Passed the End Date - Status was "Registered" |
2009-02-09 | Was CETA until Last Date for Achievement |
Elective | 58721 | Further Education and Training Certificate: Engineering Fabrication | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Elective | 59769 | Further Education and Training Certificate: Mechanical Engineering: Pipe-Fitting | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Elective | 59731 | Further Education and Training Certificate: Mechanical Handling (Rigging) | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Elective | 57887 | Further Education and Training Certificate: Welding Application and Practice | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | Academic Institute of Excellence |
2. | Centurion Akademie |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |