All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Inspect, test, maintain and repair Low / Medium voltage overhead networks |
SAQA US ID | UNIT STANDARD TITLE | |||
113866 | Inspect, test, maintain and repair Low / Medium voltage overhead networks | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 8 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the electrical low / medium voltage reticulation environment.
A person credited with this unit standard will be able to do the following on low / medium voltage reticulation networks: This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical construction- and distribution environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and / or equivalent:
|
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and prepare to inspect, test and maintain / repair Low / Medium Voltage overhead networks. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Job instructions are obtained and the section of electrical network to be inspected / maintained / repaired is identified according to geographical / electrical network diagrams. |
ASSESSMENT CRITERION 2 |
2. Task instructions are interpreted and a sequence of operation is planned according to maintenance procedures. |
ASSESSMENT CRITERION 3 |
3. Isolation of the affected section of the network is arranged according to job instructions / maintenance schedules or breakdown reports where necessary. |
ASSESSMENT CRITERION 4 |
4. Appropriate tools are identified and selected to meet the requirements of the task and according to job requirements. |
ASSESSMENT CRITERION 5 |
5. Tools, materials, transport / rigging and safety equipment required for installing the unit are selected and checked for functionality according to statutory requirements. |
SPECIFIC OUTCOME 2 |
Inspect and test for defects on Low / Medium Voltage overhead networks. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Conditions are assessed and safety measures implemented according to safe work procedures. |
ASSESSMENT CRITERION 2 |
2. The affected section of the electrical reticulation network is visually inspected from ground level prior to testing / maintenance / repairs according to prescribed routine inspection sheets or fault finding procedures. |
ASSESSMENT CRITERION 3 |
3. Ensure that the affected section of the electrical reticulation network is isolated and prepared for testing according to faultfinding / operating procedures. |
ASSESSMENT CRITERION 4 |
4. The applicable test instruments are selected and testing carried out according to specific task requirements. |
ASSESSMENT CRITERION 5 |
5. Safety precautions / procedures are followed before, during and after inspection and testing installation. |
SPECIFIC OUTCOME 3 |
Maintain / repair Low / Medium Voltage overhead networks. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Handout of the affected section of the network is received according to job instructions or breakdown reports where necessary. |
ASSESSMENT CRITERION 2 |
2. The affected electrical hardware and equipment is assessed for possible safety risks and preventative measures implemented according to safety risk assessment procedures. |
ASSESSMENT CRITERION 3 |
3. The electrical hardware and equipment is maintained, repaired or replaced according to applicable maintenance procedures or manufacturer`s specifications. |
ASSESSMENT CRITERION 4 |
4. The maintained or replaced electrical hardware and equipment is inspected and tested to ensure that it is operational according to manufacturer`s requirements. |
SPECIFIC OUTCOME 4 |
Complete the work task. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Work area is restored to serviceable condition according to statutory requirements. |
ASSESSMENT CRITERION 2 |
2. Completion of job is communicated according to local reporting procedures. |
ASSESSMENT CRITERION 3 |
3. Ensure that the replaced hardware and equipment has been returned to the stores as per local asset management procedures. |
ASSESSMENT CRITERION 4 |
4. Appropriate tools and safety equipment are cared for and stored according to statutory requirements. |
ASSESSMENT CRITERION 5 |
5. Documentation is completed according to work site procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Knowledge that will help me understand and that I will be able to explain:
|
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identifying and solving problems in which responsible decisions have been made regarding the maintenance / replacement of electrical line hardware / equipment. |
UNIT STANDARD CCFO WORKING |
Working effectively with others as a member of the electrical maintenance team. |
UNIT STANDARD CCFO ORGANISING |
Organising and managing oneself and one`s activities, responsibly and effectively. |
UNIT STANDARD CCFO COLLECTING |
Collecting, analysing, organising and critically evaluating information. |
UNIT STANDARD CCFO COMMUNICATING |
Communicating effectively, using visual and / or language skills by means of oral / written reports. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 20419 | National Certificate: Electrical Engineering | Level 3 | NQF Level 03 | Passed the End Date - Status was "Registered" |
2004-02-10 | Was EWSETA until Last Date for Achievement |
Elective | 48475 | National Certificate: Electrical Engineering | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2009-02-18 | Was EWSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | UGESI STEP BY STEP TRAINING |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |