SAQA All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.
SOUTH AFRICAN QUALIFICATIONS AUTHORITY 
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: 

Install and commission three phase AC machines and control gear 
SAQA US ID UNIT STANDARD TITLE
10264  Install and commission three phase AC machines and control gear 
ORIGINATOR
SGB Electrical Engineering & Construction 
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY
-  
FIELD SUBFIELD
Field 12 - Physical Planning and Construction Electrical Infrastructure Construction 
ABET BAND UNIT STANDARD TYPE PRE-2009 NQF LEVEL NQF LEVEL CREDITS
Undefined  Regular  Level 4  NQF Level 04 
REGISTRATION STATUS REGISTRATION START DATE REGISTRATION END DATE SAQA DECISION NUMBER
Passed the End Date -
Status was "Reregistered" 
2007-04-03  2009-02-18  SAQA 0160/05 
LAST DATE FOR ENROLMENT LAST DATE FOR ACHIEVEMENT
2010-02-18   2013-02-18  

In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise.  

This unit standard is replaced by: 
US ID Unit Standard Title Pre-2009 NQF Level NQF Level Credits Replacement Status
259217  Install and commission AC machines and control gear  Level 4  NQF Level 04   

PURPOSE OF THE UNIT STANDARD 
This unit standard is for persons in the Electrical Engineering; Generation; Distribution;
Transmission, Construction and Renewable Energy Sector

A person credited with this unit standard will be capable of:
Selecting, installing, connecting, commissioning three phase A.C. machines and control gear

This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and
transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. 

LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING 
The following knowledge, skills attitude and / or equivalent:
  • Introduction to industry (work environment)
  • Statutory requirements
  • Use of relevant testing and measuring equipment and hand tools
  • Unit standard for single phase AC machines 

  • UNIT STANDARD RANGE 
    Three phase A.C. machines and control gear includes but is not limited to:

    a. Induction motors,
    b. slip-ring motors
    c. synchronous motors, alternators

    Testing and measuring equipment include but is not limited to:

    a. Multimeters,
    b. Insulation tester,
    c. Clip-on ammeter

    Statutory Requirements Definition: Statutory requirements include but are not limited to:
  • Section .01 OHS Act,
  • Section .02 SABS Regulations,
  • Section .03 Mineral Act,
  • Section .04 Local Authority requirements,
  • Section .05 Manufacturer`s specifications

    Worksite procedures.

    Control gear may include but is not limited to - Direct on line / sequence / forward &
    reverse / resistance / slip-ring / rotary switch, starters. 

  • Specific Outcomes and Assessment Criteria: 

    SPECIFIC OUTCOME 1 
    Plan to install and commission three phase AC machines and control gear. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Job instruction is evaluated and a sequence of operation is determined. 

    ASSESSMENT CRITERION 2 
    2. Applicable electrical drawings are correctly analysed and selected to meet job requirements. 

    ASSESSMENT CRITERION 3 
    3. Equipment and personal protective equipment is selected, and evaluated for functionality and safety prior to commencement. 

    ASSESSMENT CRITERION 4 
    4. Safety procedures related to job requirements and work site procedures are obtained. 

    ASSESSMENT CRITERION 5 
    5. Three phase AC machines and their associated control gear are identified and selected according to job instructions. 

    ASSESSMENT CRITERION 6 
    6. Permission is obtained to carry out task according to instructions and drawings. 

    ASSESSMENT CRITERION 7 
    7. Appropriate tools are identified and selected to meet the requirements of the task according to statutory requirements. 

    ASSESSMENT CRITERION 8 
    8. Appropriate tools are identified and selected to meet the requirements of the task according to statutory requirements. 

    SPECIFIC OUTCOME 2 
    Prepare to install, connect and commission three phase AC machines and control gear. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Work area is demarcated according to work site procedures. 

    ASSESSMENT CRITERION 2 
    2. Three phase AC machine and control gear is evaluated in accordance with manufacturer`s specifications and functional requirements. 

    ASSESSMENT CRITERION 3 
    3. Work site is analysed for safety and hazards and corrective action is taken according to statutory requirements. 

    ASSESSMENT CRITERION 4 
    4. Installation area is prepared for the placing / mounting and securing of the machines and control gear as per job instructions, drawings and diagrams. 

    SPECIFIC OUTCOME 3 
    Install three phase A.C. machines and control gear. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Appropriate tools are selected and used correctly as per manufacturers specifications and work site standards. 

    ASSESSMENT CRITERION 2 
    2. All machines and associated control gear is evaluated and tested for functionality to meet desired operational requirements. 

    ASSESSMENT CRITERION 3 
    3. Three phase A.C. machines and control gear are installed according to instructions, drawings, diagrams, manufacturers specifications and statutory requirements. 

    ASSESSMENT CRITERION 4 
    4. The consequences of not using the tools are explained according to statutory requirements. 

    SPECIFIC OUTCOME 4 
    Connect three phase A.C. machines and control gear. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Appropriate tools are used to meet the requirements of the task according to statutory requirements. 

    ASSESSMENT CRITERION 2 
    2. All personal protective equipment is used as per safety requirements and work site standards. 

    ASSESSMENT CRITERION 3 
    3. The appropriate control gear is connected to the AC machines as per specifications and operational requirements. 

    ASSESSMENT CRITERION 4 
    4. Three phase AC machines and associated control gear are connected to supply and load according to manufacturers specifications and operational requirements. 

    SPECIFIC OUTCOME 5 
    Commission three phase AC machines and control gear. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Appropriate test and measuring equipment are selected and correctly applied to meet the job requirements. 

    ASSESSMENT CRITERION 2 
    2. Commissioning tests are carried out according to worksite procedures and statutory requirements. 

    ASSESSMENT CRITERION 3 
    3. Commissioning is carried out and operational tests conducted to determine if AC machine and control gear is functioning according to desired requirements. 

    ASSESSMENT CRITERION 4 
    4. The ability of gathering information is demonstrated by making use of logical methods according to fault finding techniques where applicable. 

    ASSESSMENT CRITERION 5 
    5. Commissioning is carried and operational tests conducted to determine if AC machine and control gear is functioning according to desired requirements. 

    SPECIFIC OUTCOME 6 
    Complete installation, connection and commissioning of three phase AC machines and control gear. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Work area is restored to serviceable condition according to statutory requirements. 

    ASSESSMENT CRITERION 2 
    2. Reports or documentation and drawings are accurately updated and returned to relevant departments according to statutory requirements. 

    ASSESSMENT CRITERION 3 
    3. Appropriate tools are examined, cared for and stored according to statutory requirements. 

    ASSESSMENT CRITERION 4 
    4. Damaged or faulty tools are identified, marked for repairs or replacement or according to statutory requirements. 

    ASSESSMENT CRITERION 5 
    5. Tests are accurately recorded and effectively communicated to relevant parties as per work site procedures and standards. 


    UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS 
    1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.
    2. Any institution offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA by SAQA.
    3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines in the relevant qualification and the agreed ETQA procedures. 

    UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE 
  • Names, locations and functions of three phase A.C. machines and control gear
  • Basic safety procedures related to testing and measuring equipment and hand tools
  • Worksite procedures
  • Installation, connection, commissioning, testing and measuring techniques.
  • Names, locations and functions of appropriate tools
  • Safety related to each tool
  • Care and storage of tools 

  • UNIT STANDARD DEVELOPMENTAL OUTCOME 
    N/A 

    UNIT STANDARD LINKAGES 
    N/A 


    Critical Cross-field Outcomes (CCFO): 

    UNIT STANDARD CCFO IDENTIFYING 
    1. Identify, analyze and solve problems in installing, connecting testing and commissioning 3 phase AC machines and control gear. 

    UNIT STANDARD CCFO WORKING 
    Work effectively with others involved during installation, connecting and commissioning 3 phase AC machines and control gear. 

    UNIT STANDARD CCFO ORGANISING 
    Organise and manage oneself in planning the work and determining a sequence of operation. 

    UNIT STANDARD CCFO COLLECTING 
    Collect, analyse, organise and critically evaluate information obtained during installation, connecting and commissioning 3 phase AC machines and control gear. 

    UNIT STANDARD CCFO COMMUNICATING 
    Communicate effectively with fellow workers and involved parties, the interpretation and reporting processes. 

    UNIT STANDARD ASSESSOR CRITERIA 
    N/A 

    UNIT STANDARD NOTES 
    This unit standard has been replaced by unit standard 259217, which is "Install and commission AC machines and control gear", Level 4, 8 credits.

    This Unit Standard was originally registered on 12 June 2002 under SAQA decision number 0742/02. It has been re-registered on 11 February 2004 under SAQA 2552/04.


    Supplementary information:

    Specified Requirements
  • SABS
  • OHS Act

    Credits

    Total hours required by the learner to achieve the required outcomes:
    6
    Activity Hours
    Classroom learning 15
    On-the-job learning 20
    Self directed learning 10
    Coaching required 15
    Other

    TOTAL 60

    Credits achieved: 6 

  • QUALIFICATIONS UTILISING THIS UNIT STANDARD: 
      ID QUALIFICATION TITLE PRE-2009 NQF LEVEL NQF LEVEL STATUS END DATE PRIMARY OR DELEGATED QA FUNCTIONARY
    Core  48474   National Certificate: Electrical Engineering  Level 4  Level TBA: Pre-2009 was L4  Passed the End Date -
    Status was "Reregistered" 
    2009-02-18  Was EWSETA until Last Date for Achievement 


    PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: 
    This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here.
     
    NONE 



    All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.