All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Produce bullion by means of a furnace |
SAQA US ID | UNIT STANDARD TITLE | |||
256693 | Produce bullion by means of a furnace | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 5 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
9587 | Produce bullion by means of a furnace | Level 3 | NQF Level 03 | 5 |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are responsible for producing bullion by means of a furnace.
People credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
|
UNIT STANDARD RANGE |
The following range applied to this unit standard:
Bullion includes all precious metals in lump form Furnaces must include the following: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate knowledge relating to bullion production. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The requirements pertaining to a safe, healthy work environment when producing bullion and the consequences of not adhering to the above are explained in terms of specified requirements. |
ASSESSMENT CRITERION 2 |
The importance of producing bullion is explained in terms of achieving specified production requirements. |
ASSESSMENT CRITERION 3 |
Hazards and associated risks pertaining to bullion production are identified through relevant risk assessment procedures. |
ASSESSMENT CRITERION 4 |
The actions to be taken should hazards and risks be encountered are explained in terms of specified requirements. |
ASSESSMENT CRITERION 5 |
The principal components of the bullion production system are identified and explained in the context of minerals processing. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 6 |
The actions to be taken, should sub-standard conditions and problems pertaining to the bullion production process be encountered, are explained in terms of specified requirements. |
ASSESSMENT CRITERION 7 |
The security requirements pertaining to bullion production are explained in terms of legal and site-specific requirements. |
ASSESSMENT CRITERION 8 |
The elementary principles of the bullion production process are explained in the context of minerals processing. |
ASSESSMENT CRITERION 9 |
The communication requirements pertaining to bullion production and the consequences of non-compliance are explained in terms of legal and site-specific requirements. |
ASSESSMENT CRITERION 10 |
The operating parameters and control methods and the consequences of not adhering to these are explained in terms of operational requirements. |
ASSESSMENT CRITERION 11 |
The factors affecting the optimum performance of the smelting process are explained in terms of operational requirements. |
SPECIFIC OUTCOME 2 |
Prepare to produce bullion. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal protective and safety equipment is verified, examined and used in accordance with prescribed practices. |
ASSESSMENT CRITERION 2 |
Tools and equipment are verified and examined in accordance with prescribed practices. |
ASSESSMENT CRITERION 3 |
Workplace hazards and associated risks are dealt with in accordance with recommendations set out in the applicable risk assessment. |
ASSESSMENT CRITERION 4 |
The bullion production system is examined and substandard conditions are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 5 |
The charge is prepared and loaded in accordance with operational requirements. |
ASSESSMENT CRITERION 6 |
Lock-out procedures are adhered to in accordance with specified requirements. |
ASSESSMENT CRITERION 7 |
Occupational safety and health precautions towards self and others are maintained in accordance with specified requiremetns. |
ASSESSMENT CRITERION 8 |
Security requirements pertaining to bullion production are met in accordance with legal and site-specific requirements. |
SPECIFIC OUTCOME 3 |
Produce bullion. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal protective and safety equipment is used in accordance with prescribed practices. |
ASSESSMENT CRITERION 2 |
The start-up of the bullion production system is conducted in accordance with plant standard task procedures. |
ASSESSMENT CRITERION 3 |
The bullion production process is monitored and controlled in accordance with plant standard task procedures. |
ASSESSMENT CRITERION 4 |
Safe and optimum production is ensured through effective communication. |
ASSESSMENT CRITERION 5 |
Tools and equipment are used in accordance with prescribed practices. |
ASSESSMENT CRITERION 6 |
Work related hazards and associated risks are dealt with in accordance with recommendations set out in the applicable risk assessment. |
ASSESSMENT CRITERION 7 |
Operational problems encountered are dealt with in accordance with operational requirements. |
ASSESSMENT CRITERION 8 |
Security requirements pertaining to bullion production are met in accordance with legal and site-specific requirements. |
ASSESSMENT CRITERION 9 |
The production process is conducted consistently with environmental policy and other relevant requirements. |
ASSESSMENT CRITERION 10 |
Occupational safety and health precautions towards self and others are maintained in accordance with specified requirements. |
SPECIFIC OUTCOME 4 |
Complete the bullion production process. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The bullion production system is stopped in accordance with plant standard task procedures. |
ASSESSMENT CRITERION 2 |
The products are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 3 |
Personal protective and safety equipment is dealt with in accordance with prescribed practices. |
ASSESSMENT CRITERION 4 |
Tools and equipment are dealt with in accordance with prescribed practices. |
ASSESSMENT CRITERION 5 |
Good housekeeping practices are maintained in accordance with plant policy. |
ASSESSMENT CRITERION 6 |
Security requirements pertaining to bullion production are met in accordance with legal and site-specific requirements. |
ASSESSMENT CRITERION 7 |
Reporting and data-recording requirements are met in accordance with legal and site-specific requirements. |
ASSESSMENT CRITERION 8 |
Preparation for maintenance is conducted in accordance with specified requirements. |
ASSESSMENT CRITERION 9 |
Lock-out procedures are adhered to in accordance with specified requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The following embedded knowledge will be assessed in an integrated way in the context of the unit standard:
Knowledge relating to producing bullion by means of a furnace: Critical factors relating to producing bullion by means of a furnace: Processes and events relating to producing bullion by means of a furnace: Causes and effects (Occupational safety and health): Procedures and techniques relating to producing bullion by means of a furnace: Regulations, legislation, agreements, policies and standards: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team, group, organisation or community.
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, thus showing responsibility towards the environment and health of others.
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces unit standard 9587, "Produce bullion by means of a furnace", Level 3, 5 credits.
Terminology: Specified requirements include legal and site specific requirements are contained in one or more of the following documents: Legal: Site Specific: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 62769 | National Certificate: Mineral Processing | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MQA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |